ALI SNOUSSI
NETWORK AND SYSTEM SECURITY GOVERNANCE EXPERT
ISO/IEC 27005 LEAD RISK MANAGER
Experience
2021-2023
EDF DP2d
Industrial Information Systems Architect
Definition of the architecture of the industrial information system for the centralized underwater storage facility for used nuclear fuel during the basic preliminary design phase.
2020-2021
EDvance
Cybersecurity Consultant
Complying the industrial information system of the EPR unit of the Flamanville 3 Nuclear Power Plant with the bylaw of March 10, 2017, relating to the civil nuclear sector.
2017-2020
EDF CNEN/EDVANCE
Contract Technical Lead
Technical management of the primary effluent treatment function on the Flamanville 3 EPR project.
2016
EDF CIT
Commissioning Engineer
Commissioning the de-pollution systems (exhaust fumes desulphurization and denitrification) of Le Havre and Cordemais Coal-Fired Thermal Power Plants.
2014-2016
EDF CIT
I&C Design Engineer
Upgrading the Digital Control System of de-pollution systems (exhaust fumes desulphurization and denitrification) of Le Havre and Cordemais Coal-Fired Thermal Power Plants.
2012-2014
EDF CNEN
Automation Tester
Conducting Factory Acceptance Tests in order to validate the Digital Control System of the Flamanville 3 Nuclear Power Plant.
2011
ALSTOM
Automation Engineer
Automation block programming for the Alstom Controcad system following the construction of the Sostanj Thermal Power Plant in Slovenia.
DP2D : Direction des Projets Déconstruction-Déchets
CNEN : Centre National d’Équipement Nucléaire
CIT : Centre d’Ingénierie Thermique